Residential & commercial
Electrical Panel Upgrades
Your electrical panel decides how much power your building can use safely. If it's a fuse box, runs hot, trips constantly or can't take another circuit, it may be time to replace or upgrade it.
What is an electrical panel upgrade?
An electrical panel upgrade replaces the breaker box (or old fuse box) that distributes power to every circuit in a building. Sometimes it also raises the building's service capacity, for example from 100 amps to 200 amps, so the building can safely run more equipment at once.
Many older Triangle homes were built with 60- or 100-amp service, before central air, electric ranges, heat pumps, hot tubs and EV chargers were common. Adding those loads to an undersized panel leads to nuisance tripping, overheated connections and no room for new circuits.
How do you know your panel needs attention?
- You still have fuses. Fuse boxes are easy to over-fuse and have no room for modern protection such as AFCI and GFCI breakers.
- Breakers trip often or won't stay reset, even on ordinary loads.
- The panel is warm, buzzing or smells hot, or you see rust, water stains or scorch marks.
- There's no open space for a new circuit, or the panel is full of tandem breakers.
- You're adding a big load: an EV charger, heat pump, electric range, hot tub, shop or addition.
- You have a panel brand inspectors often flag, such as some Federal Pacific Stab-Lok and Zinsco panels, which home inspectors and insurers frequently ask owners to replace.
Panel replacement, service upgrade or subpanel?
| Option | What it does | Typical reason |
|---|---|---|
| Panel replacement | New breaker panel at the same amperage | Worn, damaged, problem-brand or full panel |
| Service upgrade | Raises capacity (for example 100 to 200 amps), often with a new meter base and service conductors | Major new loads, additions, all-electric conversions |
| Subpanel | Adds a second panel fed from the main | Detached garage or shop, basement finish, more breaker spaces |
| Load management | Device that limits or shares power between large loads | Adding an EV charger without a full service upgrade |
What does a panel upgrade involve?
- Load calculation. The electrician adds up existing and planned loads to size the new panel or service.
- Permit. Panel and service work generally requires an electrical permit from your city or county inspections department.
- Utility coordination. A service upgrade needs the utility to disconnect and later reconnect power. In Raleigh that's usually Duke Energy. Inside their service areas, Apex and Clayton run their own town electric utilities.
- Installation. The old panel comes out, and the new panel, breakers, grounding and bonding go in. Every circuit is labeled.
- Inspection and power-up. After the work passes inspection, power is restored.
Most homes are without power for part of the day during the changeover, so plan for refrigerators, medical devices and work-from-home setups.
Panels for commercial spaces
Shops, offices and restaurants often outgrow their panels when tenants change, new equipment arrives or EV charging is added to the parking lot. Commercial panel work follows the same steps, scheduled to limit downtime for the business.
Panel upgrades by location
Housing stock changes what panel work looks like in each town. Older Raleigh and Durham homes are where fuse boxes and 60-amp services still turn up. In newer Apex and Clayton homes, the usual reason is capacity for EV chargers and additions. Find details for your area: Clayton electrician, Raleigh electrician, Durham electrician and Apex electrician.
Related services: EV charger installation, generator installation and wiring and rewiring.
Common questions about panel upgrades
How do I know if my electrical panel needs to be replaced?
Common signs are a fuse box instead of breakers, breakers that trip often or won't reset, a panel that feels warm or smells hot, rust or scorch marks, no open spaces for new circuits, and plans to add a large load such as an EV charger, heat pump or addition. An electrician can tell you whether a repair, a replacement or a service upgrade fits.
What is the difference between a panel replacement and a service upgrade?
A panel replacement swaps the breaker box for a new one, usually at the same amperage. A service upgrade raises the amperage your building can draw, for example from 100 to 200 amps. That can also mean a new meter base, larger service conductors and coordination with your electric utility.
Do I need a permit for a panel upgrade in North Carolina?
Panel replacements and service upgrades generally require an electrical permit and an inspection through your city or county inspections department. The utility usually has to disconnect and reconnect power for a service upgrade, which happens after the work passes inspection.
Can I add an EV charger without upgrading my panel?
Often, yes. A load calculation shows how much spare capacity your existing service has. If there isn't enough, options include a load-management device, a lower-amperage charger setting or a service upgrade.
Call about a panel upgrade
All four locations are open 24 hours, 7 days a week.